The design requirement was for a 2 km funicular railway. 1.8
km of the railway is supported on a reinforced concrete viaduct, while the upper
200m of railway is constructed within a cut and cover tunnel.
The project also involved the design of new top and bottom stations, a new sewerage
treatment plant for a population, equivalent of 1500, and a pumped water supply
system working at a pressure of 32 bar.
|
|
|
|
|
|
|
|
|
|
|